Quarterly Progress Report West Bengal (KMA) :
Sl.
KMWSA Projects
1.
15 MGD WTP for Bansberia and Hooghly Chinsurah
2.
10 MGD WTP at Uluberia
3.
Integration of Maheshtala UGR with existing Water Supply network
4.
3 MG UGR Cum Booster Station at Gandhi Maidan, Akra
5.
Surface Water Supply for Baruipur Municipal Area
6.
Surface Water Supply for Added areas of Howrah M.C
7.
15 MGD Water Treatment Plant at Palta and Integration of the plant with North Barrackpore and Barackpore Municipal Supply system
KMC Projects
8.
30MGD(Phase-I) Water Treatment Plant at Dhapa
9.
Upgradation of non man entry brick sewer for city of Kolkata
10.
Rehabilitation/Upgradation of Man entry Brick Sewer (Part-I) for city of Kolkata
KMDA Projects
11.
Transmunicipal drainage scheme within Khardah, Panihati, North Dum Dum, Dum Dum, South Dum Dum
12.
Municipal SWM of 10 municipal towns in KMA
13.
Construction of Flyover Between EMBP & KNI Sarani
14.
Construction of EM-Bypass Connector from Padma pukur to Kamalgachi, Kolkata
15.
Surface water supply scheme for Municipal Town of Naihati, Halisahar, Kanchrapara, Gayeshpur and uncovered areas of Kalyani
Multiple Agencies Projects
16.
Development and management of Water Supply and sewerage system at Sector –V under Nabadiganta Industrial Township Authority at Salt lake, Kolkata
17.
Improvement of drainage in Howrah city and its vicinity
HRBC Project
18.
Construction of left turning North bound project off-ramp at Beck Bagan Connecting AJC Bose Road Fly-over
PWD Project
19.
Construction of Interchange at Dunlop Junction under JNNURM
CMC Project
20.
24x7 Water Supply scheme for Chandannagar Municipal Corporation